Formats
Scope, duration and what is in the file.
Diagnostic review
Scope and duration Two to three weeks. Interviews with the people who currently compile the month, a sample of extracts, and a written note on definitions, gaps and a recommended pack date. Planning range: SGD 3,200–6,400.
You receive A findings note, a draft metric list, and a build quote if a reporting pack is warranted. No model is built in this format.
Reporting build
Scope and duration Four to eight weeks after the data audit. Management pack and metric dictionary; cash view or unit economics if scoped. Two review rounds. Planning range: SGD 8,500–18,000.
You receive Working files, dictionary, refresh instruction, recorded walkthrough. Dashboard work is a line item, not assumed.
Retained analytics
Scope and duration Monthly collect–draft–release–review on named working days, plus a quarterly recalibration. Three-month minimum. Planning range: SGD 2,400–5,800 per month.
You receive The pack on the agreed date, a movement note, review minutes, and a log of drift. Ad-hoc cuts from the existing model are in scope; new models are quoted separately.
Board-pack support
Scope and duration A board or investor pack assembled from the existing dictionary, on your board calendar. Planning range: SGD 1,800–3,600 per cycle, once a reporting build exists.
You receive A stable tab set, a commentary page limited to movement in defined measures, and a version issued 48 hours before the meeting where the calendar allows. We do not write a commercial pitch.